The Whole Kitchen, One Contract
About half our refacing customers add counters or backsplash to the job, and somewhere along the way we became a full kitchen remodeler. The advantage of doing it under one roof is boring but real: one schedule, one foreman, one phone number, and nobody pointing at the other trade when a seam isn't right.
What We Handle
- Countertops — quartz (Caesarstone, Silestone, MSI), granite, and solid surface. Templated digitally, cut locally, installed by our counter crew
- Backsplash tile — subway, glass mosaic, natural stone. Our tile guy Ray has been laying tile for 26 years and it shows
- Sinks & faucets — undermount conversions are the most common ask when counters change
- Under-cabinet lighting — LED strip or puck, hardwired or plug-in
- Layout changes — moving an appliance, adding an island, opening a peninsula. We bring in our licensed plumber and electrician (employees, not subs) as needed
A Realistic Timeline
| Scope | Typical Duration |
|---|---|
| Refacing + counters + backsplash | 2 – 3 weeks door to door |
| Full remodel, same layout | 3 – 4 weeks |
| Full remodel with layout changes | 5 – 7 weeks |
Those numbers include the annoying gaps — counter templating to installation runs about 8 business days because the slab has to be cut after the cabinets are set. Anyone who quotes shorter is guessing.
We don't do: structural wall removal, room additions, or flooring throughout the house. We'll happily recommend the two general contractors we trust for the big stuff.